False ceiling work

Suspended Ceiling Method statement

SUSPENDED CEILING WORK 1.0 OBJECTIVE To describe the procedure for installing suspended ceiling for the buildings under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE To install suspended ceilings in the buildings at Service Berth, Service Base and

Suspended Ceiling Method statement Read Post »

ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete for Foundation Building Structures

Screed Method statement

FLOOR SCREED WORKS 1.0 OBJECTIVE 1.1  To describe the procedure, for laying of floor screed for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings in at Service Base Area, Service Berth Area,

Screed Method statement Read Post »

Bituminous-Membrane-Waterproofing

Roof waterproofing Method statement

ROOF WATER-PROOFING 1.0 OBJECTIVE 1.1 Is to define the requirements for laying of roof water proofing membrane for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Water and thermal proofing of roof of buildings in Service Base

Roof waterproofing Method statement Read Post »

Rebar on construction site

Reinforcement Method statement

STEEL REINFORCEMENTS FOR CONCRETE WORKS 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and execution g Reinforcement   works for the constructions under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For foundation, substructure and

Reinforcement Method statement Read Post »

method-statement-for-water-proofing-membrane-for-swimming-pool

Protection to substructure Method statement

PROTECTION WORK TO SUBSTRUCTURE 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and fixing of substructure protection works for the building foundations under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For the building

Protection to substructure Method statement Read Post »

Plaster Work

Plastering Method statement

PLASTERING WORK 1.0 OBJECTIVE 1.1  To define the requirements and procedure for plastering works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings and utilities at Service Base Area, Service Berth Area,

Plastering Method statement Read Post »