Method Statement for SURVEYING AND SETTING OUT

SURVEYING AND SETTING OUT 1.0 OBJECTIVE: 1.1 Is to define the procedure for surveying and setting out works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE: 2.1 Applicable to all buildings and utilities at Base Area, New Service Berth in Berth Area,  […]

Suspended Ceiling Method statement

SUSPENDED CEILING WORK 1.0 OBJECTIVE To describe the procedure for installing suspended ceiling for the buildings under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE To install suspended ceilings in the buildings at Service Berth, Service Base and F.S.O Marine areas 3.0 REFERENCE […]

Screed Method statement

FLOOR SCREED WORKS 1.0 OBJECTIVE 1.1  To describe the procedure, for laying of floor screed for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings in at Service Base Area, Service Berth Area, FSO Marine and Telecom buildings. […]

Roof waterproofing Method statement

ROOF WATER-PROOFING 1.0 OBJECTIVE 1.1 Is to define the requirements for laying of roof water proofing membrane for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Water and thermal proofing of roof of buildings in Service Base Area, Service     Berth area and […]

Reinforcement Method statement

STEEL REINFORCEMENTS FOR CONCRETE WORKS 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and execution g Reinforcement   works for the constructions under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For foundation, substructure and superstructure of buildings and utilities […]

Protection to substructure Method statement

PROTECTION WORK TO SUBSTRUCTURE 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and fixing of substructure protection works for the building foundations under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For the building foundations at Base Area, New […]

Plastering Method statement

PLASTERING WORK 1.0 OBJECTIVE 1.1  To define the requirements and procedure for plastering works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings and utilities at Service Base Area, Service Berth Area, FSO Marine and Telecom buildings. […]