CONTRACTOR CHECK LIST FAN
CONTRACTOR CHECK LIST FAN
CONTRACTOR CHECK LIST FAN Read Post »
CONTRACTOR CHECK LIST AIR SYSTEM
CONTRACTOR CHECK LIST AIR SYSTEM Read Post »
SURVEYING AND SETTING OUT 1.0 OBJECTIVE: 1.1 Is to define the procedure for surveying and setting out works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE: 2.1 Applicable to all buildings and utilities at Base Area, New
Method Statement for SURVEYING AND SETTING OUT Read Post »
SUSPENDED CEILING WORK 1.0 OBJECTIVE To describe the procedure for installing suspended ceiling for the buildings under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE To install suspended ceilings in the buildings at Service Berth, Service Base and
Suspended Ceiling Method statement Read Post »
FLOOR SCREED WORKS 1.0 OBJECTIVE 1.1 To describe the procedure, for laying of floor screed for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings in at Service Base Area, Service Berth Area,
Screed Method statement Read Post »
ROOF WATER-PROOFING 1.0 OBJECTIVE 1.1 Is to define the requirements for laying of roof water proofing membrane for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Water and thermal proofing of roof of buildings in Service Base
Roof waterproofing Method statement Read Post »
STEEL REINFORCEMENTS FOR CONCRETE WORKS 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and execution g Reinforcement works for the constructions under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For foundation, substructure and
Reinforcement Method statement Read Post »
PROTECTION WORK TO SUBSTRUCTURE 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and fixing of substructure protection works for the building foundations under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For the building
Protection to substructure Method statement Read Post »
PLASTERING WORK 1.0 OBJECTIVE 1.1 To define the requirements and procedure for plastering works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings and utilities at Service Base Area, Service Berth Area,
Plastering Method statement Read Post »