October 2022

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

Method Statement for Construction of Ducts for Fire & Water Supply Network

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments  1. Scope: 1.1 This Method Statement covers the construction of ducts for fire and water supply network under taxiways, roads and wherever needed. 2. Definitions: 2.1     MS: STM Method Statement : Ducts for fire and water supply networks. […]

Method Statement for Construction of Ducts for Fire & Water Supply Network Read Post »

Rockwool panel

Method Statement for Erecting Sandwich Panels

CONTENTS Scope of Work Definitions References Subcontractors Materials Tools  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the erection/installation of wall and roof sandwich panels for the temporary site offices of Parsons, Halcrow and OAJ.   2. Definitions: 2.1     CM: Construction Manager     2.2 SE: Site Engineer

Method Statement for Erecting Sandwich Panels Read Post »

Manhole-Excavation

Method Statement for Pipe Lines Installation
with Concrete Surround

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments  1. Scope: 1.1 This Method Statement covers the laying and installation of GRP and u-PVC Pipes with Concrete encasement. 2. Definitions: 2.1     MS: STM Method Statement : Storm Water Drainage Work     2.2 ITR  Inspection and Test

Method Statement for Pipe Lines Installation
with Concrete Surround
Read Post »

Manhole-Excavation

Method Statement for Manhole Construction (Cast In Situ Stormwater Manholes)

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the cast in situ concrete storm water manholes, single and double catch pit Type (I), (II), and (III).   2. Definitions: 2.1     MS: Storm Water Drainage Method Statement     2.2

Method Statement for Manhole Construction (Cast In Situ Stormwater Manholes) Read Post »

METHOD STATEMENT FOR MV CABLE PULLING AND INSTALLATION

Method Statement for Future and Split Ducts

CONTENTS Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1.0    Purpose To ensure that future, split duct and related activities are executed safely and in          accordance with the contract requirements and that all quality assurance / control               activities are conducted in a systematic manner,

Method Statement for Future and Split Ducts Read Post »

Method Statement for Installation oof HDPE Piping

Method Statement for Installation of D.I pipes

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the installation of  D.I pipes. 2. Definitions: 2.1     MS: D.I Method Statement: ductile iron method statement.     2.2 ITR  Inspection And test Request     2.3 PPS   Particular Project Specification

Method Statement for Installation of D.I pipes Read Post »

Method Statement for Sub base and Gravel Base

Method Statement for GRP Pipes Laying with Granular Surround

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the laying of GRP Pipes with Granular surround. 2. Definitions: 2.1     MS: STM Method Statement : Storm Water Drainage Work     2.2 ITR  Inspection and Test Request     2.3

Method Statement for GRP Pipes Laying with Granular Surround Read Post »

Manhole-Excavation

Method Statement for Storm Water and Drainage Earthwork

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the following activities related to Storm Water and Drainage works       Site cleaning and grading   Trench excavation and backfill   Structural excavation and Backfill  2. Definitions: 2.1     MS:

Method Statement for Storm Water and Drainage Earthwork Read Post »

surveyor work

Method Statement for Surveying Work

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the various steps in Site Survey Works.     2. Definitions: 2.1     MS: STM Method Statement : Surveying Work     2.2 ITR  Inspection and Test Request     2.3 PPS  

Method Statement for Surveying Work Read Post »

Scroll to Top