October 2022

Risk Assessment Procedure Step wise Guide

ACTIVITY HAZARD ANALYSIS Installation of Communication Sub-Ducts

HAZARD / WORK:       Installation of Communication Sub-Ducts LOCATION: ______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 […]

ACTIVITY HAZARD ANALYSIS Installation of Communication Sub-Ducts Read Post »

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

Toolbox talks for Rendering works

Toolbox talks:-Manual HandlingCOSHHNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could

Toolbox talks for Rendering works Read Post »

Plaster Work

Method Statement for Rendering Works for Buildings

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the rendering works for all the buildings are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are

Method Statement for Rendering Works for Buildings Read Post »

Plaster Work

ACTIVITY HAZARD ANALYSIS Rendering Works for Buildings

HAZARD / WORK: Rendering Works for Buildings LOCATION: ______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3

ACTIVITY HAZARD ANALYSIS Rendering Works for Buildings Read Post »

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

Toolbox talks for excavation works

Toolbox talks:-Manual HandlingCOSHHExcavationsNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening. A bad back or injury today, could, and regularly does, turn into a painful back problem for life! Lifting incorrectly could

Toolbox talks for excavation works Read Post »

AAC BLOCK

ACTIVITY HAZARD ANALYSIS Block Works for Building

HAZARD / WORK: Block Works for Building LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders. Musculoskeletal injuries. Cuts, abrasions. Foot / toe injuries     X       2 Dehydration, heat exhaustion. Heat stroke     X   Employees…………………… X 3 Cuts,

ACTIVITY HAZARD ANALYSIS Block Works for Building Read Post »

Scroll to Top