Submission of external interlock quotation provided by RTA approved contractor.

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       : Regarding submission of external interlock quotation provided by RTA approved contractor. Dear Sir, With Ref.to above the we are here by attaching the required work at ROW, which include the modification […]

Strip light in parapet at Pool aera

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       :  Regarding strip light in parapet at Pool aera and required sample from clinet for groove diamension/intimation of the variation.  Dear Sir,                   With reference to above we would like to intimate […]

Handing over Substation to DEWA

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       :  Item No. 4.1.i for handing over of DEWA Substation and Intimation by Senior Co-ordinator of DEWA Dear Sir, With reference to the above mentioned subject, we would like to inform you […]

Confirmation and Verbal Instruction

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       :  Confirmation and Verbal Instruction Dear Sir, With reference to the above mentioned subject, we are kindly requesting for the confirmation as per the attached Verbal Instruction happened during the meeting held […]

Core Cutting Variation at Ground Floor for Breeching Inlet

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject       :  Regarding Core Cutting Variation at Ground Floor for Breeching Inlet Dear Sir, With reference to the above mentioned subject, we would like to  inform that there is the variation for 4 […]

RTA confirmation non-requirement of traffic      impact study in writing.

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject      : Regarding Our Approach to RTA to confirm non-requirement of traffic      impact study in writing for interlock NOC. Dear Sir, With reference to the above mentioned subject, we would like to inform […]

Under Taking Letter  Regarding the Adjustment of Reinforcement Cover

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai      Subject     :  Under Taking Letter  Regarding the Adjustment of Reinforcement Cover in Swimming Pool and Upper Roof Slab Dear Sir, With reference to above, we are rectifying and adjusting the reinforcement cover […]

Electrical and TV points requirement on the existing column in Stag bar

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai      Subject            : Electrical and TV points requirement on the existing column in Stag bar   area. (MEP drawing for stag bar attached here with for column) of ref.no. CC/AP/269/SH/DTS/004. Dear Sir, With reference […]

Submission of the test report from laboratory for 16 & 25 mm Jindal steel

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai Subject           : Submission of the test report from laboratory for 16 & 25 mm Jindal steel as   per your ref. AP/269/CC/446 dated 28 October xxx. Dear Sir, With reference to CC/AP/624/17 and your […]

Submission of lift hook load testing quotation from third party

Date:               xxx Ref:                  xxx Kind Attn         :Mr. xxx Project:            2B + G + 14+ Lower Roof Hotel Building on Plot No. xxx at Al Barsha 1st, Dubai      Subject              : Submission of lift hook load testing quotation from third party. Dear Sir, With reference to above we are submitting quotation for lift hook load testing received from third parties as […]