Purpose of work: It describes the methodology for the execution for the un-even surface at Retaining Wall Vertical Joint. EXECUTION FOR SURFACE PREPARATIONAll loose materials should be removed from the surface by manually chipping of excess concrete until it reached the minimum thickness and by gradual mechanical abrading until it achieved and reached the same… Continue reading METHOD STATEMENT FOR UN-EVEN SURFACE AT RETAINING WALL VERTICAL CONSTRUCTION JOINT
Month: February 2021
METHOD STATEMENT FOR GYPSUM CEILING WORK
CONTENTS SCOPE OF WORK SUBMITTALS SITE INSTALLATION WORKS FRAME WORK INSPECTION, MEP CLEARNCE & CLOSURE FINISHING GYPSUM BOARD ASSEMBLIES FINAL CHECK UP AND HANDING OVER SNAGGING / DESNAGGING SCOPE OF WORK Supply and installation of Gypsum ceiling all in accordance… Continue reading METHOD STATEMENT FOR GYPSUM CEILING WORK