Sale!

Monthly Progress Report Guide – High-Rise Building

Rated 5.00 out of 5 based on 1 customer rating
(2 customer reviews)

Original price was: 18,00 $.Current price is: 4,00 $.

Monthly Progress Report template in professional printed format for high rise buildings.

Guaranteed Safe Checkout

Table of Contents:

Executive Summary…………………………………………………………………Section 1

Progress Report………………………………………………………………………Section 2

List of Equipment………………………………………………………………….            ..Section 3

Record of Manpower…………………………………………………………………Section 4

Requirement of Subcontractors / Suppliers …………………………………………Section 5

Material Submittal Log………………………………………………………………Section 6

Shop Drawing Submittal Log………………………………………………………. Section 7

RFI Log………………………………………………………………………………Section 8

Inspection Request Report Log………………………………………………….….Section 9

Method Statement Log………….…………………………………………………..Section 10

Procurement Log-Long Lead Items………………………………………………… Section 11

  1. Procurement Log PC Items
  2. Procurement Log PS Items
  3. Procurement Log on Long Lead Item

Progress Photos…………………………………………………………………….            Section 12

HSE Report…………………………………………………………………………            Section 13

Weight 0,5 kg
Dimensions 30 × 22 × 3 cm

2 reviews for Monthly Progress Report Guide – High-Rise Building

  1. Rated 5 out of 5

    Ahmed K. (verified owner)

    Excellent quality template, very professional and well-structured.

  2. Rated 5 out of 5

    Mohammed S. (verified owner)

    Great document, saved me a lot of time on my project.

Add a review

Your email address will not be published. Required fields are marked *

2B + GF + 14 Floors + Lower Roof Hotel BuildingMonthly Progress Report Guide – High-Rise Building
Original price was: 18,00 $.Current price is: 4,00 $.
Scroll to Top