Sale!

Technical Guide for Fire Prevention System Installation

Rated 5.00 out of 5 based on 1 customer rating
(2 customer reviews)

Original price was: 25,00 $.Current price is: 8,00 $.

Method Statement for Installation of Fire Prevention System in professional printed format.

Guaranteed Safe Checkout

Method Statement for Installation of Fire Pretention System Professional Printed Format.
– SPRINKLER PIPING SYSTEM
– SPRINKLER PIPING SYSTEM
– WET RISER PIPING
– TESTING & COMMISSIONING OF FIRE PROTECTION SYSTEM
– FIRE PUMPS
– TESTING & COMMISSIONING OF FIRE WATER PUMPS
– Installation Check List for Fire Water Pumps
– Pre commissioning Check list for Fire Water Pumps

WET RISER PIPING

1.0 Scope:

This method statement is applicable to the installation of Wet Riser Pipes and Hose reels, related fittings and accessories, to ensure that the pipe work and other related fittings and accessories are properly installed and conforms to the requirement of contract specification and NFPA 14.

2.0 Purpose:

To define the installation of Wet Riser Pipes with Mechanical Grooved and Threaded fittings, Fire fighting accessories e.g. Hose reel, Landing valve, etc.

3.0 Applicable locations:

3.1 East and West Towers and Podiums.

4.0 Method:

4.1 Preparation work

Before commencing any installation of Wet Riser Piping with fittings and accessories the following activities shall be carried out by the responsible representative of the company.

4.1.1 Check that the approved construction drawing of current revision is readily available for installation.

4.1.2 Verification of material used for installation, should have an approved material submittal.

4.1.3 Check the type and working conditions of pipe and applicable or required fittings and accessories as per the contract specifications.

4.1.4 Verify the availability of all required accessories on construction SITE
prior to start of any installation activity.

4.1.5 Loading and unloading of pipes should be carried out by hands and use of skids should be avoided. Pipes should not be dragged along rough surface. Extra care should be exercised in handling small dia pipes to avoid damage.

4.1.6 Check the work area as per the safety aspect; it should be clean, tidy and safe for installation of fire fighting piping systems.

2 reviews for Technical Guide for Fire Prevention System Installation

  1. Rated 5 out of 5

    Ahmed K. (verified owner) –

    Excellent quality template, very professional and well-structured.

  2. Rated 5 out of 5

    Mohammed S. (verified owner) –

    Great document, saved me a lot of time on my project.

Add a review

Your email address will not be published. Required fields are marked *

Request to consider fire pump delivery and installation in July invoice. - Construction TemplateTechnical Guide for Fire Prevention System Installation
Original price was: 25,00 $.Current price is: 8,00 $.
Scroll to Top