Resources loaded (Cost Manpower and equipment) Construction Programme or Baseline Programme for a G+1 Villa (duplex House)
Showing the single result
-
Resources Loaded Construction Programme | G+1 Villa Cost &
Original price was: 25,00 $.9,00 $Current price is: 9,00 $. Add to cartProfessional resources loaded construction programme for G+1 Villa with cost, manpower, equipment in .xer format. Includes S-curve, cash flow, histogram.
