Method Statement for Dewatering

Re-route your Dewatering Line

CONTENTS Scope of Work Definitions References Subcontractors Materials Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments 1. Scope: 1.1 This Method Statement covers the various methods utilized to control water in excavation.     2. Definitions: 2.1 MS: STM Method Statement : Storm Water Drainage Work     2.2 ITR    Inspection and Test Request… Continue reading Method Statement for Dewatering

Method Statement for the Installation of Temporary and Interim Security Fence, Removal of Chain Link Fence

Method Statement for the Installation of Temporary and Interim Security Fence, Removal of Chain Link Fence

Table of Contents Purpose Scope of Work Definitions References Materials Plant  & Equipment Safety Prior Activities 9.0     Procedure 9.1 Installation of Temporary and Interim Security Fence 9.2 Removal of Chain Link Fence 10.0  Responsibilities 11.0  Attachments 11.1 Drawing PGAD 745/1008/G-311-A-R 0 1.0    Purpose To ensure that all Installation of Temporary and Interim Security Fence,… Continue reading Method Statement for the Installation of Temporary and Interim Security Fence, Removal of Chain Link Fence

METHOD STATEMENT UNDER GROUND FIRE FIGHTING WORK

3-tips-for-Fire-Pump

Contents: Objective  Scope References Material Material Procurement, Handling and Storage Trenching & Bedding Backfilling Assembly & Laying BUTT WELD PROCESS Pressure Testing Outside The Trench Testing In The Trench Objective This method statement provides information concerning the method of construction to ensure compliance with contract requirements, drawing, technical specification and quality control to provide a… Continue reading METHOD STATEMENT UNDER GROUND FIRE FIGHTING WORK

METHOD STATEMENT UNDER GROUND PLUMBING WORK

uPVC High Pressure Water Supply Piping System Installation Procedure

Objective This method statement provides information concerning the method of construction to ensure compliance with contract requirements, drawing, technical specification and quality control to provide a successful installation, testing, and commissioning of the Installation of U/G UPVC Pipes. Scope HAC shall complete installation of uPVC pipes including excavation and backfilling, testing, witness testing at the… Continue reading METHOD STATEMENT UNDER GROUND PLUMBING WORK

Method Statement For VRF SYSTEM

Method Statement For VRF SYSTEM

CONTENTS SCOPE PURPOSE RESPONSIBILITES SAFTY PROCEDURES COMMESIONING SCOPE: The scope of this method statement covers installation of the VRF System (Refrigerant Piping Network, Piping Fittings and Transmission Networks) for all floors in accordance with specifications and drawings. PURPOSE: The Purpose of this method statement is to describe the materials which will be used and work… Continue reading Method Statement For VRF SYSTEM

METHOD STATEMENT PLUMBING WORK

METHOD STATEMENT WATER SUPPLY WORK

Contents: Objective  Scope References Material Material Procurement, Handling and Storage Procedure of works Objective This method statement provides information concerning the method of construction to ensure compliance with contract requirements, drawing, technical specification and quality control to provide a successful installation of the Installation of St.St. Box for water & drainage points at terraces. Scope… Continue reading METHOD STATEMENT PLUMBING WORK

METHOD STATEMENT FOR PLUMBING WORKS

METHOD STATEMENT WATER SUPPLY WORK

CONTENTS INTRODUCTION PURPOSE SCOPE REFERENCES DEFINITIONS ORGANIZATION CHART DUTIES AND RESPONSIBILITIES METHOD STATEMENT FOR EQUIPMENT INSTALLATION METHOD STATEMENT FOR PLUMBING INSTALLATION METHOD STATEMENT FOR PLUMBING SYSTEM TEST QUALITY CONTROL SAFETY PLAN INTRODUCTION This method statement details the method of performing the various activities involved in the course of works for field installation works of Plumbing… Continue reading METHOD STATEMENT FOR PLUMBING WORKS

METHOD STATEMENT FOR HVAC WORKS

Method Statement for HVAC Ductwork Insulation and Acoustic Lining

CONTENTS INTRODUCTION PURPOSE SCOPE REFERENCES DEFINITIONS ORGANIZATION CHART DUTIES AND RESPONSIBILITIES METHOD STATEMENT FOR EQUIPMENT INSTALLATION METHOD STATEMENT FOR DUCT INSTALLATION METHOD STATEMENT FOR REFRIGERANT PIPING INSTALLATION Refrigerant pipe Insulation METHOD STATEMENT FOR HVAC SYSTEM TEST METHOD STATEMENT FOR TESTING, AJUSTING AND BALANCING(T.A.B) QUALITY CONTROL SAFETY PLAN INTRODUCTION This method statement details the method of… Continue reading METHOD STATEMENT FOR HVAC WORKS

METHOD STATEMENT FOR HVAC CONTROL WORKS

Method Statement for HVAC Ductwork Insulation and Acoustic Lining

CONTENTS INTRODUCTION PURPOSE SCOPE REFERENCES DEFINITIONS ORGANIZATION CHART DUTIES AND RESPONSIBILITIES METHOD STATEMENT FOR HVAC CONTROL PANEL AND DEVICES INSTALLATION METHOD STATEMENT FOR CABLE TRAY, CONDUIT PIPE AND CABLING/WIRING INSTALLATION METHOD STATEMENT FOR HVAC CONTROL SYSTEM TEST QUALITY CONTROL SAFETY PLAN INTRODUCTION This method statement details the method of performing the various activities involved in… Continue reading METHOD STATEMENT FOR HVAC CONTROL WORKS

Method Statement for Fire Pumps Routine Test

3-tips-for-Fire-Pump

Method Statement for Fire Pumps Routine Test As per NFPA 25, Chapter 8 (attached copy) Visual Inspection shall be done in a weekly base for the pump room, valves, pumps, etc. Weekly no-flow test shall be done at Saturday from 1 p.m. to 2 p.m. Discharge gate valve on the main line shall be closed.… Continue reading Method Statement for Fire Pumps Routine Test

Exit mobile version