Method Statement for SURVEYING AND SETTING OUT

surveyor work

SURVEYING AND SETTING OUT 1.0 OBJECTIVE: 1.1 Is to define the procedure for surveying and setting out works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE: 2.1 Applicable to all buildings and utilities at Base Area, New… Continue reading Method Statement for SURVEYING AND SETTING OUT

Suspended Ceiling Method statement

False ceiling work

SUSPENDED CEILING WORK 1.0 OBJECTIVE To describe the procedure for installing suspended ceiling for the buildings under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE To install suspended ceilings in the buildings at Service Berth, Service Base and… Continue reading Suspended Ceiling Method statement

Screed Method statement

ACTIVITY HAZARD ANALYSIS Casting Blinding Concrete for Foundation Building Structures

FLOOR SCREED WORKS 1.0 OBJECTIVE 1.1  To describe the procedure, for laying of floor screed for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings in at Service Base Area, Service Berth Area,… Continue reading Screed Method statement

Roof waterproofing Method statement

Bituminous-Membrane-Waterproofing

ROOF WATER-PROOFING 1.0 OBJECTIVE 1.1 Is to define the requirements for laying of roof water proofing membrane for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Water and thermal proofing of roof of buildings in Service Base… Continue reading Roof waterproofing Method statement

Reinforcement Method statement

steel rebar for reinforcement concrete at construction site with house under construction background

STEEL REINFORCEMENTS FOR CONCRETE WORKS 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and execution g Reinforcement   works for the constructions under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For foundation, substructure and… Continue reading Reinforcement Method statement

Protection to substructure Method statement

method-statement-for-water-proofing-membrane-for-swimming-pool

PROTECTION WORK TO SUBSTRUCTURE 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and fixing of substructure protection works for the building foundations under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For the building… Continue reading Protection to substructure Method statement

Plastering Method statement

PLASTERING WORK 1.0 OBJECTIVE 1.1  To define the requirements and procedure for plastering works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings and utilities at Service Base Area, Service Berth Area,… Continue reading Plastering Method statement