CONTRACTOR CHECK LIST FAN
Month: October 2022
CONTRACTOR CHECK LIST AIR SYSTEM
CONTRACTOR CHECK LIST AIR SYSTEM
COMMMMISSIONING CERTIFICATE
COMMMMISSIONING CERTIFICATE
Method Statement for SURVEYING AND SETTING OUT
SURVEYING AND SETTING OUT 1.0 OBJECTIVE: 1.1 Is to define the procedure for surveying and setting out works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE: 2.1 Applicable to all buildings and utilities at Base Area, New… Continue reading Method Statement for SURVEYING AND SETTING OUT
Suspended Ceiling Method statement
SUSPENDED CEILING WORK 1.0 OBJECTIVE To describe the procedure for installing suspended ceiling for the buildings under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE To install suspended ceilings in the buildings at Service Berth, Service Base and… Continue reading Suspended Ceiling Method statement
Screed Method statement
FLOOR SCREED WORKS 1.0 OBJECTIVE 1.1 To describe the procedure, for laying of floor screed for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings in at Service Base Area, Service Berth Area,… Continue reading Screed Method statement
Roof waterproofing Method statement
ROOF WATER-PROOFING 1.0 OBJECTIVE 1.1 Is to define the requirements for laying of roof water proofing membrane for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Water and thermal proofing of roof of buildings in Service Base… Continue reading Roof waterproofing Method statement
Reinforcement Method statement
STEEL REINFORCEMENTS FOR CONCRETE WORKS 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and execution g Reinforcement works for the constructions under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For foundation, substructure and… Continue reading Reinforcement Method statement
Protection to substructure Method statement
PROTECTION WORK TO SUBSTRUCTURE 1.0 OBJECTIVE 1.1 Is to define the requirements for the supply and fixing of substructure protection works for the building foundations under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 For the building… Continue reading Protection to substructure Method statement
Plastering Method statement
PLASTERING WORK 1.0 OBJECTIVE 1.1 To define the requirements and procedure for plastering works for the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities. 2.0 SCOPE 2.1 Applicable to all the buildings and utilities at Service Base Area, Service Berth Area,… Continue reading Plastering Method statement