METHOD STATEMENT FOR INSTALLATION AND TESTING OF DOMESTIC COLD / HOT WATER SUPPLY PIPING AND ACCESSORIES

Checklist For Above Ground Water Piping Installation

CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0  REFERENCES 4.0  DEFINITIONS 5.0  RESPONSIBILITIES 6.0  EQUIPMENT 7.0  PROCEDURE 8.0 ATTACHMENTS 1.0 PURPOSE This method statement is applicable for Installation & testing of Domestic Cold and Hot water supply Piping system and its accessories ( Above & Below Ground) in all areas for the project. 2.0 SCOPE Supply ,… Continue reading METHOD STATEMENT FOR INSTALLATION AND TESTING OF DOMESTIC COLD / HOT WATER SUPPLY PIPING AND ACCESSORIES

CHECKLIST FOR INSTALLATION OF COLD WATER PIPING SYSTEM Underground

Checklist For Above Ground Water Piping Installation

CHECK LIST FOR:     INSTALLATION OF COLD WATER PIPING SYSTEM Under Ground.   Form No: Rev. No  : 0 Page        : 1  of  1     SUBCONTRACTOR X         CONTRACTOR          SECTION OF WORK: Water Supply                                       LOCATION:  LEVEL:                                                                                           WIR No.: STAGE ITEM Checked by Checked by Date S/C CONT CONS.  … Continue reading CHECKLIST FOR INSTALLATION OF COLD WATER PIPING SYSTEM Underground

CHECK LIST FOR INSTALLATION OF SLEEVES AND PUDDLE FLANGES FOR WATER WALL

SLEEVES AND PUDDLE FLANGES FOR WATER WALL

CHECK LIST FOR:   INSTALLATION OF SLEEVES AND PUDDLE FLANGES FOR WATER WALL.   Ref. No: Rev. No: Page      : 1  of  1     SUBCONTRACTOR X       CONTRACTOR          SECTION OF WORK: Water Supply                                       LOCATION:  LEVEL: Basement                                                                         WIR No.: STAGE ITEM Checked by Checked by Date S/C CONT CONS. SETTING OUT… Continue reading CHECK LIST FOR INSTALLATION OF SLEEVES AND PUDDLE FLANGES FOR WATER WALL

Checklist For Above Ground Water Piping Installation

Checklist For Above Ground Water Piping Installation

CHECK LIST FOR:  INSTALLATION OF COLD AND HOT WATER PIPING SYSTEM AND ACCESSORIES Above Ground   Ref. No: Rev. No: 0 Page      : 1  of  1     SUBCONTRACTOR X       CONTRACTOR          SECTION OF WORK: Water supply                                                LOCATION:  LEVEL:                                                                                            WIR No.: STAGE ITEM Checked by Checked by Date S/C CONT CONS.… Continue reading Checklist For Above Ground Water Piping Installation

Air & Water balancing Method Statement

AIR DISTRIBUTION SYSTEM CHECK LIST

1. AIR BALANCING A. Fan Coil Units 1 Check that all automatic controls are fully commissioned and operating properly 2 All pre-commissioning checks have been carried out 3 Select the specified speed of the Fan Coil 4 Set all the dampers in the grill outlet at full open position 5 Take initial total flow of… Continue reading Air & Water balancing Method Statement