CHECK LIST FOR TESTING FOR WATER SUPPLY PIPING SYSTEM AND ACCESSORIES (HYDROSTATIC TEST REPORT)
Month: October 2022
METHOD STATEMENT FOR INSTALLATION AND TESTING OF DOMESTIC COLD / HOT WATER SUPPLY PIPING AND ACCESSORIES
CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS 5.0 RESPONSIBILITIES 6.0 EQUIPMENT 7.0 PROCEDURE 8.0 ATTACHMENTS 1.0 PURPOSE This method statement is applicable for Installation & testing of Domestic Cold and Hot water supply Piping system and its accessories ( Above & Below Ground) in all areas for the project. 2.0 SCOPE Supply ,… Continue reading METHOD STATEMENT FOR INSTALLATION AND TESTING OF DOMESTIC COLD / HOT WATER SUPPLY PIPING AND ACCESSORIES
INSTALLATION AND TESTING OF COLD AND HOT WATER SUPPLY PIPING SYSTEM AND ACCESSORIES
INSTALLATION AND TESTING OF COLD AND HOT WATER SUPPLY PIPING SYSTEM AND ACCESSORIES
CHECKLIST FOR INSTALLATION OF COLD WATER PIPING SYSTEM Underground
CHECK LIST FOR: INSTALLATION OF COLD WATER PIPING SYSTEM Under Ground. Form No: Rev. No : 0 Page : 1 of 1 SUBCONTRACTOR X CONTRACTOR SECTION OF WORK: Water Supply LOCATION: LEVEL: WIR No.: STAGE ITEM Checked by Checked by Date S/C CONT CONS. … Continue reading CHECKLIST FOR INSTALLATION OF COLD WATER PIPING SYSTEM Underground
CHECK LIST FOR INSTALLATION OF SLEEVES AND PUDDLE FLANGES FOR WATER WALL
CHECK LIST FOR: INSTALLATION OF SLEEVES AND PUDDLE FLANGES FOR WATER WALL. Ref. No: Rev. No: Page : 1 of 1 SUBCONTRACTOR X CONTRACTOR SECTION OF WORK: Water Supply LOCATION: LEVEL: Basement WIR No.: STAGE ITEM Checked by Checked by Date S/C CONT CONS. SETTING OUT… Continue reading CHECK LIST FOR INSTALLATION OF SLEEVES AND PUDDLE FLANGES FOR WATER WALL
Checklist For Above Ground Water Piping Installation
CHECK LIST FOR: INSTALLATION OF COLD AND HOT WATER PIPING SYSTEM AND ACCESSORIES Above Ground Ref. No: Rev. No: 0 Page : 1 of 1 SUBCONTRACTOR X CONTRACTOR SECTION OF WORK: Water supply LOCATION: LEVEL: WIR No.: STAGE ITEM Checked by Checked by Date S/C CONT CONS.… Continue reading Checklist For Above Ground Water Piping Installation
Air & Water balancing Method Statement
1. AIR BALANCING A. Fan Coil Units 1 Check that all automatic controls are fully commissioned and operating properly 2 All pre-commissioning checks have been carried out 3 Select the specified speed of the Fan Coil 4 Set all the dampers in the grill outlet at full open position 5 Take initial total flow of… Continue reading Air & Water balancing Method Statement
COMMISSIONING RECORD SPACE TEMPERATURE
COMMISSIONING RECORD SPACE TEMPERATURE
COMMISSIONING RECORD FAN PERFORMANCE
COMMISSIONING RECORD FAN PERFORMANCE
PRE-COMMISSIONING RECORD FAN MECHANICAL TEST SHEET
PRE-COMMISSIONING RECORD FAN MECHANICAL TEST SHEET