METHOD STATEMENT FOR INSTALLATION & TESTING OF DRAINAGE PIPE SYSTEM AND ACCESSORIES

uPVC High Pressure Water Supply Piping System Installation Procedure

CONTENTS 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS 5.0 RESPONSIBILITIES 6.0 EQUIPMENTS 7.0 PROCEDURE 8.0 ATTACHMENTS                           1.0 PURPOSE This method statement is applicable for Installation & testing of all types drainage piping system in all areas for the project. 2.0 SCOPE… Continue reading METHOD STATEMENT FOR INSTALLATION & TESTING OF DRAINAGE PIPE SYSTEM AND ACCESSORIES

Exit mobile version