Narrative Report for Extension of Time (EOT) Claim

Narrative Report for Extension of Time (EOT) Claim

Introduction

Project Overview:

Background:

ABC Construction Ltd. was awarded the contract for the XYZ Mixed-Use Development on January 1, 2023, with an agreed contract duration of 18 months, aiming for completion by July 31, 2024. The scope of work included the construction of a high-rise mixed-use building with commercial and residential spaces, along with a parking garage and related infrastructure.

As of the date of this report, a series of delays have occurred due to unforeseen circumstances beyond the contractor’s control, impacting the progress and completion of the project. ABC Construction is submitting this Extension of Time (EOT) claim to request an additional 60 days to complete the project and meet the revised completion date of September 30, 2024.

Delay Events Justifying Extension of Time:

1. Change in Design of Mechanical Systems

2. Unforeseen Site Conditions

3. Adverse Weather Conditions

Total Delay Impact:

The cumulative impact of these delays is 9 weeks (63 calendar days), which has affected the critical path and overall project timeline. Given the nature of these delays and their significant impact on the progress of the work, ABC Construction is requesting an Extension of Time for an additional 60 calendar days, revising the project completion date to September 30, 2024.

Justification for the Extension of Time:

  1. Unforeseen and Uncontrollable Events:
  1. Critical Path Delays:
  1. Compliance with Contract Terms:

Mitigation Measures Taken:

ABC Construction took proactive steps to minimize the impact of the delays wherever possible:

Despite these mitigation efforts, the delay events collectively impacted the critical path, making the request for an Extension of Time necessary.

Supporting Documentation:

The following documents are attached to substantiate the EOT claim:

Conclusion:

In light of the delays caused by the change in mechanical system design, unforeseen site conditions, and adverse weather events, ABC Construction respectfully requests an Extension of Time of 60 calendar days. The new completion date requested is September 30, 2024. This request is made in accordance with the contract provisions, which allow for time extensions due to excusable delays beyond the contractor’s control.

ABC Construction remains committed to delivering the XYZ Mixed-Use Development to the highest quality and within the revised project timeline, pending the approval of this Extension of Time request.

Submitted by:
ABC Construction Ltd.
[Your Name]
Project Manager
[Date]