Designing the foundation for a Mechanically Stabilized Earth (MSE) retaining wall involves considerations for stability, bearing capacity, and soil-structure interaction. Below is a detailed checklist with explanations and examples for the design of an MSE retaining wall foundation:

1. Site Investigation:

  • Explanation: Conduct a thorough site investigation to understand soil conditions.
  • Example: Perform soil tests (SPT, CPT) to determine soil properties, bearing capacity, and potential sliding or settlement.

2. Load Analysis:

  • Explanation: Analyze and calculate loads acting on the MSE retaining wall.
  • Example: Consider the weight of the wall, backfill soil pressure, surcharge loads, water pressure, and seismic loads to determine the total lateral load.

3. Bearing Capacity:

  • Explanation: Ensure that the soil bearing capacity is sufficient for the applied loads.
  • Example: If the total lateral load is 150 kN/m and the soil bearing capacity is 300 kN/m², the foundation is considered suitable.

4. Sliding Stability:

  • Explanation: Check and ensure the foundation resists sliding.
  • Example: Calculate the sliding force and compare it to the resisting force provided by the foundation. Use appropriate safety factors.

5. Foundation Geometry:

  • Explanation: Determine the appropriate dimensions and shape of the foundation.
  • Example: Design a foundation with proper width, length, and reinforcement to distribute the loads evenly along the length of the MSE retaining wall.

6. Reinforcement:

  • Explanation: Specify reinforcement in the foundation and MSE wall, if required.
  • Example: Include geogrid reinforcement layers within the backfill to enhance the MSE wall’s stability and improve overall performance.

7. Foundation Depth:

  • Explanation: Determine the optimal foundation depth for stability.
  • Example: Increase the foundation depth if weak or compressible soil layers are present near the surface.

8. Drainage:

  • Explanation: Implement drainage measures to reduce hydrostatic pressure.
  • Example: Install drainage pipes or geocomposite drains behind the MSE wall to relieve water pressure and prevent water accumulation.

9. Backfill Specifications:

  • Explanation: Specify backfill material properties and compaction requirements.
  • Example: Use granular backfill material with proper gradation and compaction to achieve the required density and frictional resistance.

10. Facing Connection:

  • Explanation: Detail the connection between the MSE facing and the foundation.
  • Example: Ensure that the facing panels or blocks are securely attached to the foundation using appropriate connectors.

11. Construction Sequence:

  • Explanation: Develop a construction sequence that ensures stability during and after construction.
  • Example: Place and compact the foundation material, install the geogrid reinforcement layers, construct the MSE wall facing, and ensure proper compaction of the backfill.

12. Quality Control:

  • Explanation: Implement quality control measures during construction.
  • Example: Monitor the compaction of backfill, check reinforcement placement, verify the dimensions of the foundation, and ensure proper facing installation.

13. Code Compliance:

  • Explanation: Ensure compliance with local building codes and standards.
  • Example: Adhere to relevant codes such as AASHTO LRFD Bridge Design Specifications or local geotechnical standards.

14. Professional Engineer Involvement:

  • Explanation: Engage a qualified geotechnical and structural engineer to oversee the design.
  • Example: Have licensed engineers review and approve the MSE retaining wall foundation design to ensure it meets safety and code requirements.

15. Record Keeping:

  • Explanation: Maintain detailed records of the MSE retaining wall foundation design process.
  • Example: Document all design calculations, soil test results, construction activities, and as-built drawings for future reference and audits.

By following this checklist, engineers can ensure a well-designed MSE retaining wall foundation that effectively resists lateral loads, provides stability, and minimizes potential failure modes.

By Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.