Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Regarding to supply and fix RCCB type B instead of ELCB 60 A 300 ma as per DEWA load schedule and cost variance Dear Mr.… Continue reading Regarding to supply and fix RCCB type B instead of ELCB 60 A 300 ma as per DEWA load schedule and cost variance
Author: Md Abu Zaed Khan
Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.
Provide required detail/drawing for requirement of core cutting for cable
Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Provide required detail/drawing for requirement of core cutting for cable and approval from xxx Dear Mr. Mayur and Mr. Ramesh, With reference to… Continue reading Provide required detail/drawing for requirement of core cutting for cable
Removal of your heavy materials as we will be removing tower crane
Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Removal of your heavy materials as we will be removing tower crane on Dear Mr. Mayur and Mr. Ramesh, This is to inform… Continue reading Removal of your heavy materials as we will be removing tower crane
Collection of Signed Contract Document from us One (1) no. Elevator (SL 1) for construction activity
Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Collection of Signed Contract Document to us One (1) no. Elevator (SL 1) for construction activity Dear Mr. Mayur and Mr. Ramesh, We are… Continue reading Collection of Signed Contract Document from us One (1) no. Elevator (SL 1) for construction activity
Quotation for supply and installation of cable for CCTV & WIFI in all three lifts
Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Regarding to provide the quotation for the supply and installation of cable for CCTV & WIFI in all three lifts. Dear Mr. Ramesh &… Continue reading Quotation for supply and installation of cable for CCTV & WIFI in all three lifts
Regarding Dumb Waiter Co-ordination and Handing Over
Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Regarding Dumb Waiter Co-ordination and Handing Over Dear Sir, With reference to the above mentioned subject, we have given you numerous calls for the dumb… Continue reading Regarding Dumb Waiter Co-ordination and Handing Over
Regarding safety related issue and our concern.
Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Regarding safety related issue and our concern. Dear Mr.xxx, With reference to above we would like to inform the following related issue of safety and… Continue reading Regarding safety related issue and our concern.
For lift shaft scaffolding and our concern for the access ladder
Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : For lift scaffolding and our concern for the access ladder your Ref No.NI16 026-SC-NI-CMX-BARSHA-013 Dated 29.11.2017. Dear Sir, With ref to above we would… Continue reading For lift shaft scaffolding and our concern for the access ladder
Regarding the requirement of the beam in lift no.02 in your drawing and Issue of the design and calculation
Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Regarding the requirement of the beam in lift no.02 in your drawing and Issue of the design and calculation. Dear Sir, With reference to… Continue reading Regarding the requirement of the beam in lift no.02 in your drawing and Issue of the design and calculation
Eliminate the comments on shop drawing
Date: XXX CC/SCHINDLER/002 To : M/s XXX Intl.Ltd Project : 2B + G + 14 + Lower Roof Hotels Building, Plot No. XXX at Al Barsha 1st, Dubai Subject : Eliminate the comments on shop drawing Dear Sir, With ref to above, as we returned the lift drawing which is commented by consultant ,there are… Continue reading Eliminate the comments on shop drawing