Method Statement for Laying of 25mm Dia. AGL Duct in Existing Construction

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the laying of the 25mm diameter AGL duct is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works… Continue reading Method Statement for Laying of 25mm Dia. AGL Duct in Existing Construction

JOB HAZARD ANALYSIS Laying of 25mm Dia. AGL Duct in Existing Construction

Hazard Meaning and Definition

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Laying of 25mm Diameter AGL Duct in Existing Construction     Date:04 July 2007 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Service location survey Manual handling operations… Continue reading JOB HAZARD ANALYSIS Laying of 25mm Dia. AGL Duct in Existing Construction

ACTIVITY HAZARD ANALYSIS Laying of 25mm Dia. AGL Duct in Existing Construction

ACTIVITY HAZARD ANALYSIS Construction of Open Concrete Formed Channel

HAZARD / WORK:       Laying of 25mm Dia. AGL Duct in Existing Construction LOCATION:______________________________________________ H=High                        M=Medium                   L=Low                                Significant Risks H M L   Who May Be Harmed 1 Work related upper limb disorders, musculoskeletal injuries, cuts, abrasions, and foot / toe injuries     X       2 Dehydration, heat exhaustion, heat stroke  … Continue reading ACTIVITY HAZARD ANALYSIS Laying of 25mm Dia. AGL Duct in Existing Construction

Method Statement For Surface Friction Treatment Selection Trial (Base Case)

Compaction Trials of Bituminous Pavement Layers

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the Surface Friction Treatment (SFT) Selection Trial (Base Case) is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner,… Continue reading Method Statement For Surface Friction Treatment Selection Trial (Base Case)

Method Statement for Compaction Trials of Bituminous Pavement Layers

Compaction Trials of Bituminous Pavement Layers

CONTENTS Purpose Scope of Work Definitions References Materials, Tools, Plant & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the compaction trials of the bituminous pavement layers is executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works… Continue reading Method Statement for Compaction Trials of Bituminous Pavement Layers

Toolbox talks for Sub-Surface Deglottalization of Infrastructure

JOB HAZARD ANALYSIS TOOLBOX TALKS ATTACHMENTS Casting Blinding Concrete for Foundation Building Structures

Toolbox talks:-Manual HandlingCOSHHNOISE Manual Handling We lift, manoeuvre and handle goods every day of our lives in one way or another, not just whilst at work but also during social activities such as gardening, DIY, shopping and sport. A bad back or injury today, could, and regularly does, turn into a painful back problem for… Continue reading Toolbox talks for Sub-Surface Deglottalization of Infrastructure

Method Statement for Sub-Surface Deglottalization of Infrastructure

Method Statement for Sub base and Gravel Base

CONTENTS Purpose Scope of Work Definitions References Materials Tools, Plant  & Equipment Safety Prior Activities Procedure Responsibilities Attachments Purpose 1.1       To ensure that the sub-surface delethalisation of all infrastructure within the graded portion of the runway strip that constitutes a buried upstand less than 400mm below ground level is executed safely and in accordance with… Continue reading Method Statement for Sub-Surface Deglottalization of Infrastructure

JOB HAZARD ANALYSIS Subsurface Delethalization of Infrastructure

Hazard Meaning and Definition

The responsible person is to ensure the control measures below are in place before the activity is carried out   TASK: Sub-Surface Delethalisation of Infrastructure     Date:28 December 2006 No ACTIVITY HAZARD RISK CONTROL MEASURES TO MINIMISE / ELIMINATE RISK RESPONSIBLE PERSON 1 Marking out area to be laid Use of hand tools  … Continue reading JOB HAZARD ANALYSIS Subsurface Delethalization of Infrastructure

Exit mobile version