Method Statement Title: Installation & Testing of Underground Drainage Piping

uPVC High Pressure Water Supply Piping System Installation Procedure

Method Statement Title: Installation & Testing of Underground Drainage Piping 1.0       Scope 1.1       This method statement details the method for installation and hydrostatic testing of underground drainage piping. 2.0       Material             2.1       UPVC Pipes to EN1401-1 (Formerly BS 4660) with push-fit grooved joints. 3.0       Applicable Location             East and West Podium – Basement level. 4.0      … Continue reading Method Statement Title: Installation & Testing of Underground Drainage Piping

Exit mobile version