Method Statement Title: Installation of Generator and ATS.

Installation Check List For ATS

1.0       Scope Note : A separate Method Statement Ref. : ETA/MS/E-039 shall be submitted for Testing & Commissioning of Generator and ATS. 2.0       Material 3.0       Applicable Location 4.0       Method 4.2.1.1 Installation Procedure: 4.2.2    ATS : 5.0       Records 6.1       Inspection Check List for Generator & ATS.

Exit mobile version