METHOD STATEMENT FOR THE CONCRETING at RAMP SLAB

Concreting-of-reinforced-concrete-slab-photo-by-the-author-of-the-paper

Purpose of WorkThis work procedure describes the method to be adopted for Concreting Work at Ramp Slab as shown in the drawings and as directed by the engineer in charge. Reference Contract Specification.o C45/20 OPC (210kg)+50% GGBS(210kg) Applicable drawings.o DM Approved drawing Equipment’s Required Concrete Placer Pump with 42m arm length – 1 no. working… Continue reading METHOD STATEMENT FOR THE CONCRETING at RAMP SLAB