TABLE OF CONTENTSSectionDescriptionPage No1.0PURPOSE AND SCOPE42.0OBJECTIVES43.0REFERENCES44.0GENERAL4-65.0PRE-WORKS6-96.0WORKS9-127.0DUCT AIR LEAKAGE TEST PROCEDURE13-198.0RESPONSIBILITIES209.0ENGINEERING2010.0MATERIALS2111.0PLANT AND EQUIPMENT21-2212.0HEALTH, SAFETY & WELFARE2213.0ENVIRONMENT2214.0COMMUNICATION AND TRAINING2315.0QUALITY CONTROL23Method Statement for HVAC DUCTWORK & ACCESSORIESPage 3 of 20
Tag: METHOD STATEMENT FOR INSTALLATION OF HVAC DUCTWORK
METHOD STATEMENT FOR INSTALLATION OF HVAC DUCTWORK
METHOD STATEMENT FOR INSTALLATION OF HVAC DUCTWORK TABLE OF CONTENTSSectionDescriptionPage No1.0PURPOSE AND SCOPE42.0OBJECTIVES43.0REFERENCES44.0GENERAL4-65.0PRE-WORKS6-96.0WORKS9-127.0DUCT AIR LEAKAGE TEST PROCEDURE13-198.0RESPONSIBILITIES209.0ENGINEERING2010.0MATERIALS2111.0PLANT AND EQUIPMENT21-2212.0HEALTH, SAFETY & WELFARE2213.0ENVIRONMENT2214.0COMMUNICATION AND TRAINING2315.0QUALITY CONTROL23Method Statement for HVAC DUCTWORK & ACCESSORIESPage 3 of 20