Method Statement for Installation of Fire Pretention System

3-tips-for-Fire-Pump

SPRINKLER PIPING SYSTEM 1.0       Scope The  scope  of  this  method  statement  is  to  describe  the  method  of  installation  of sprinkler piping system in xxx (Project Name) – The Residences Project in accordance with the project specifications. 2.0       Material 2.1       Sprinkler pipes to ASTM A536 GR `B’ 2.2       Zone Control Valve 2.3       Test and Drain Valves… Continue reading Method Statement for Installation of Fire Pretention System

Exit mobile version