METHOD STATEMENT ENGINEERED WOOD FLOORING

METHOD STATEMENT ENGINEERED WOOD FLOORING

METHOD STATEMENT FLOOR THICKNESS: 7/9/10/13/15/20/30mm FLOATING & GLUE-DOWN INSTALLATION METHOD RECEIVING & STORING PRE-INSTALLATION & SURFACE PREPARATION INSTALLATION & FINAL INSPECTION RECEIVING & STORAGE ITEM No. ACCEPTANCE CRITERIA   REFERENCE A ENGINEERED WOOD FLOORING RECEIVING & STORAGE   A1     A2     A3 PACKAGING Wood flooring bundles shall be shipped and received in… Continue reading METHOD STATEMENT ENGINEERED WOOD FLOORING

Exit mobile version