Date:               xxx

Ref:                 CC/269/LW/11

To:                   Schindler Lift Pars Intl. Ltd

Kind Attn:      Mayur Hingorani

Project:           2B + G + 14 + Lower Roof Hotel Building

Plot No.:          373-1297 at Barsha, Dubai

Subject:          Regarding dumb waiter drawing rejection by our consultant and its details

Dear Mayur,

With ref. to above, the general arrangement drawing for the dumb waiter, ref no NI-16026-DW-01/01 had been rejected by consultant the drawing has to resubmitted and kindly note the following:

  1. The drawings are not as per our project site measurements and you have provided the drawing which is having only floor dimension and floor to floor height is not mentioned.
  1. In the list of Builder work item no-03 for shaft ventilation kindly provide the direction and size of the shaft ventilation above ceiling.
  1. Provide the sectional details through doors to identify the required civil work and supporting mechanism.
  1. Ground floor level to be mentioned as per approved drawing i.e, F.F.L + 0.45
  1. First floor level and ground floor level to be mentioned in the section details which is done separately for this project where first floor level F.F.L is 4.97m
  1. The clear height from first floor to bottom of the second floor beam which is 3.60m to be mentioned in the drawing.

So, the drawings for dumb waiter need to be resubmitted by incorporating all the above mentioned points and kindly do the needful immediately.

Regards,

For xxx Contracting L.L.C

xxx

General Manager