Method statement of fixing of water hammer arrestor

Method statement of fixing of water hammer arrestor
Method statement of fixing of water hammer arrestor

Method Statement for Fixing Water Hammer Arrestor

1. Introduction:
Water hammer arrestors are devices used to prevent water hammer, a hydraulic shock that occurs when the flow of water is suddenly stopped or changed direction. Fixing a water hammer arrestor involves installing it in the plumbing system to absorb the shock and protect pipes and fixtures from damage. This method statement provides a detailed step-by-step guide for fixing a water hammer arrestor, including safety precautions and adherence to standard guidelines.

2. Safety Precautions:
Before beginning any work, ensure safety by following these precautions:

  • Turn off the main water supply to the area where the water hammer arrestor will be installed.
  • Wear appropriate personal protective equipment (PPE) such as gloves and safety goggles to prevent injuries.
  • Use caution when working with tools to avoid accidents or injuries.
  • Ensure the work area is well-ventilated to avoid exposure to harmful fumes from adhesives or sealants.
  • Keep the work area clean and free from obstacles to minimize the risk of accidents or tripping hazards.

3. Tools and Materials Required:

  • Water hammer arrestor
  • Adjustable wrench or pipe wrench
  • Teflon tape
  • Pipe cutter or hacksaw
  • Deburring tool
  • Pipe fittings (if necessary)
  • Thread sealant (if necessary)
  • Pipe clamps (if necessary)

4. Procedure:

Step 1: Preparation
1.1. Turn off the main water supply to the area where the water hammer arrestor will be installed.
1.2. Identify the location where the water hammer arrestor will be installed, typically near fixtures such as faucets, toilets, or washing machines.
1.3. Gather all necessary tools and materials for the installation.

Step 2: Determining Installation Location
2.1. Determine the optimal location for installing the water hammer arrestor based on the plumbing layout and proximity to fixtures.
2.2. Ensure there is sufficient space and accessibility for installing the water hammer arrestor.

Step 3: Installing the Water Hammer Arrestor
3.1. If necessary, cut the water supply pipe using a pipe cutter or hacksaw at the chosen installation location.
3.2. Use a deburring tool to remove any burrs or rough edges from the cut ends of the pipe.
3.3. Wrap the male threads of the water hammer arrestor with Teflon tape to create a seal.
3.4. Thread the water hammer arrestor onto the pipe fitting or directly onto the water supply pipe, using an adjustable wrench or pipe wrench to tighten it securely.
3.5. If installing multiple water hammer arrestors, repeat this process for each location.

Step 4: Connecting the Water Supply
4.1. If the water hammer arrestor is installed directly onto the water supply pipe, reconnect any pipes or fittings that were disconnected during installation.
4.2. Use pipe fittings, if necessary, to connect the water hammer arrestor to the existing plumbing system.
4.3. Apply thread sealant to threaded connections to ensure a watertight seal.

Step 5: Securing the Water Hammer Arrestor
5.1. Secure the water hammer arrestor in place using pipe clamps or mounting brackets, if required.
5.2. Ensure the water hammer arrestor is positioned securely and does not move or vibrate during operation.

Step 6: Testing
6.1. Turn on the main water supply and test the plumbing system to ensure proper functionality.
6.2. Check for any leaks around the water hammer arrestor and tighten connections as necessary.
6.3. Verify that the water hammer arrestor effectively reduces hydraulic shock and prevents water hammer.

Step 7: Compliance with Standards:
Ensure that the installation of the water hammer arrestor complies with relevant industry standards and guidelines, such as:

  • National Plumbing Code
  • Manufacturer’s Installation Instructions
  • Health and Safety Regulations

Step 8: Conclusion:
Fixing a water hammer arrestor is essential for maintaining the integrity of the plumbing system and preventing damage from hydraulic shock. By following this method statement, you can achieve a professional installation that effectively reduces water hammer and protects pipes and fixtures. Regular inspection and maintenance are recommended to ensure the water hammer arrestor continues to operate effectively.

By Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.

Leave a comment

Your email address will not be published. Required fields are marked *

Exit mobile version