Method statement of fixing of hand shower

Method statement of fixing of hand shower
Method statement of fixing of hand shower

Method Statement for Fixing Hand Shower

1. Introduction:
Hand showers are common fixtures in bathrooms, providing convenience and flexibility for bathing and showering. Fixing a hand shower involves installing the showerhead and connecting it to the water supply. This method statement outlines the step-by-step procedure for fixing a hand shower, including safety precautions and adherence to standard guidelines.

2. Safety Precautions:
Before starting any work, prioritize safety by following these precautions:

  • Ensure the water supply to the shower area is turned off to prevent accidental water flow.
  • Wear appropriate personal protective equipment (PPE) such as gloves and safety goggles to prevent injuries.
  • Use tools and equipment in accordance with manufacturer instructions and safety guidelines.
  • Work in a well-ventilated area to avoid exposure to harmful fumes from adhesives or sealants.
  • Keep the work area clean and free from obstacles to minimize the risk of accidents or tripping hazards.

3. Tools and Materials Required:

  • Hand shower unit
  • Adjustable wrench
  • Screwdriver set
  • PTFE tape
  • Silicone sealant
  • Spirit level
  • Measuring tape

4. Procedure:

Step 1: Preparation
1.1. Turn off the water supply to the shower area and open the taps to drain any remaining water from the pipes.
1.2. Clear the area around the shower and ensure there is sufficient space to work comfortably.
1.3. Remove any existing fixtures or accessories that may interfere with the installation process.

Step 2: Mounting the Shower Bracket
2.1. Position the shower bracket on the wall at the desired height for the hand shower, ensuring it is within easy reach.
2.2. Use a spirit level to ensure the bracket is horizontally aligned.
2.3. Mark the fixing points on the wall using a pencil.
2.4. Drill holes at the marked positions for the mounting screws or bolts, ensuring they are the appropriate size for a secure fit.
2.5. Securely fasten the shower bracket to the wall using screws or bolts and rawl plugs if necessary.

Step 3: Attaching the Hand Shower Hose
3.1. Connect one end of the hand shower hose to the outlet port of the shower bracket.
3.2. Ensure the connection is tight and secure using an adjustable wrench.
3.3. Apply PTFE tape to the threaded end of the hose to create a watertight seal and prevent leaks.

Step 4: Installing the Showerhead
4.1. Attach the hand showerhead to the other end of the hose, ensuring a tight fit.
4.2. Use PTFE tape to seal the threaded connection and prevent leaks.
4.3. Adjust the angle of the showerhead as needed to ensure comfortable use.

Step 5: Sealing and Finishing
5.1. Apply a bead of silicone sealant around the base of the shower bracket to create a waterproof seal and prevent water from seeping into the wall.
5.2. Smooth the sealant with a damp cloth or finger to achieve a neat finish.
5.3. Wipe off any excess sealant and allow sufficient time for it to cure before turning on the water supply.

Step 6: Testing
6.1. Turn on the water supply to the shower and test the hand shower for proper functionality.
6.2. Check for leaks or drips around the connections.
6.3. Test the showerhead to ensure it provides adequate water pressure and coverage.

5. Compliance with Standards:
Ensure that the installation of the hand shower complies with relevant industry standards and guidelines, such as:

  • National Plumbing Code
  • Manufacturer’s Installation Instructions
  • Health and Safety Regulations

6. Conclusion:
Fixing a hand shower requires attention to detail and adherence to safety standards to ensure a successful installation. By following this method statement, you can achieve a professional installation that meets functional requirements and safety guidelines. Regular maintenance and inspection are recommended to prolong the lifespan of the hand shower and ensure continued performance.

By Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.

Leave a comment

Your email address will not be published. Required fields are marked *

Exit mobile version