METHOD STATEMENT FOR (PPR) Water Supply System

METHOD STATEMENT WATER SUPPLY WORK
METHOD STATEMENT WATER SUPPLY WORK

METHOD STATEMENT FOR (PPR) Water Supply System

CONTENTS

CONTENTS………………………………………………………………………………………………………….

1.0       Scope……………………………………………………………………………………………………. 3

2.0      REFERENCES…………………………………………………………………………………………………………………………………………………………..3.

3.0       Responsibilities………………………………………………………………………………… 3

4.0       SEQUENCING………………………………………………………………………………………….. 3

5.0       CONSTRUCTION PROCEDURES……………………………………………………………… 4

6.0       TESTING………………………………………………………………………………………………… 5

7.0      EQUPMENT.………………………………………………………………………………………………………………………………………5

8.0       Materials……………………………………………………………………………………………. 5

9.0       Environmental Considerations…………………………………………………… 6

10.0    Attachments……………………………………………………………………………………… 6

Attachment 1: Key to Safety Symbols…………………………………………………………………………….. 7

This method statement describe the specific safe working method which will be use by Orasccom to carry out the Draining Piping System , it gives details of how the work will be carried out , what health and safety issues and controls are involved.

Project contract no.  : Marassi project pkg # 75 & 76

Specifications            : Technical specification Section 02510 & Section 221116.

  • Construction Manager:
    • Assigning tasks of responsibilities to senior site engineers.
    • Monitoring adherence to project schedule.
    • Expeding areas of concern to best achive project schedule.
  • Senior Site Engineer:
    • Assigning areas of responsibilities to site engineers.
  • Site Engineers:                      
    • Assigning areas of responsibilities to foreman.
    • Continuous montoring of all aspects , and follow activates and co-ordinate with another activities due to any Damage of another works.
    • Inspection of  any installed Drainig pipes and fittings.
    • Liasing  with QC Engineers regarding works progression and availabilty for hold point inspections.
  • Mechanical Quality Control Engineers:
    • Ongoing inspection of all aspects of  the installation works.
    • Informaing consultant by works inspection request as and when his presence is required to carry out inspections.
    • Follow the inspected works which approved by the consultant to prevent any damage and reported it by internal site instruction .
  • Sequencing.
    • Shop drawings approval.
    • Material approval .
    • Installation of pipes with its fittings .
    • Testing according to the project specifications .
  • :

5.1 Installation preparation

  1. .

5.2 jointing of (PP-R) pipes and fittings :

  • Testing
  • Backfill along the pipe except above the pipe joints and fitting untill we proceed with the pipe test.
  • Test of the pipe according to the project specification section 02510 Division 3.5
  • Subject systems to water pressure test to prove tigtness and to flow test to prove freedom from obstruction.
  • Close all opening with plugs and fill system to point of overflow at highest opening.
  • Vent all air and ensure that water reaches all parts of system to be tested.
  •  All close sections to be tested Hydrostatic pressure Test at least 15 minutes .
  • Inspect all joints and pipes whilst under pressure and correct leaks or detective joints by replacing with new joints and materials .
  • Use callibrate pressure gage for test to prove test pressure and continue use it at all test time.
  • Repeat test after corrections are made and until systems are proven tight. 
  • Welding Device and tools .
  • Plumber tool box.
  • Personal tools.

Cosmoplast (PP-R) pipes and fitting. Transmittal No : PKG # 75&76- MT- PL-044 – Rev.01

  • Considerations

               All as per OCI procedures:

  • HSEP 01 – Evaluation of Environmental Aspects
  • HSEP 02 – Environmental Programme

By Md Abu Zaed Khan

Hello, this is Engr. Zaed Khan Planning Engineer, Associate member of Society of Engineers UAE. Expert in construction project planning, FIDIC red book, computation of extension of time claim, Contract agreement and contractual letters.