Concreting Method statement

ACTIVITY HAZARD ANALYSIS Construction of Cast-in-Situ Concrete for Building structure

ACTIVITY HAZARD ANALYSIS Construction of Cast-in-Situ Concrete for Building structure

CONCRETING WORKS

1.0 OBJECTIVE

1.1 Is to define the requirements for the design, supply and execution g concrete works for the constructions under the contract no GTC.101/ED/01 Engineering, Procurement, Installation and Commissioning (EPIC) of Ras Laffan Utilization Project –Buildings and utilities and support service Phase 1-Utilities.

2.0 SCOPE

2.1 For foundation, substructure and superstructure of buildings and utilities at Base     Area, New Service Berth in Berth Area, FSO Marine and Telecom building.

3.0 REFERENCE

3.1 Project Approved Drawings

3.2 Qatar Petroleum Standard Specification for Civil Works Clause 3.8.1 3.17 to 3.22, 3.38

3.3 Qatar Construction Spec. Section 5, part 15

3.4 British Standards BS 5328, 1881

4.0 PROCEDURE

5.0 RECORDS

5.1 Inspection reports

5.2 Checklist

5.3 Slump and cube log