CHECK SHEET FOR INSTALLATION OF ROOF DRAIN, FUNNEL FLOOR DRAIN & FLOWER BED DRAIN
CHECK SHEET FOR: INSTALLATION OF ROOF DRAIN, FUNNEL FLOOR DRAIN & FLOWER BED DRAIN | Ref. No: FM-6012-0065 Rev. No: 00 Page : 1 of 1 Date : 23-02-2013 | |||||||
SUBCONTRACTOR | X | CONTRACTOR | ||||||
SECTION OF WORK: Plumbing LOCATION: | ||||||||
STAGE | ITEM | Checked by | Checked by | Date | ||||
ASEM | ALJABER | ADNOC | ||||||
SETTING OUT | Check Layout | ||||
Check Level, Check level debt | |||||
MEP/CIVIL | Check for Services Clearances | ||||
INSTALLATION | Check materials are as per approved material submittal. | ||||
Check that there are no re-bar protrusions on the openings. | |||||
Check that size of opening as per approved builder’s work lay-out or structural lay-out. | |||||
Check that proper alignment of drains. | |||||
Check installation details as per the approved shop drawings. | |||||
Check that pipes have been tested for leaks. | |||||
Check that supports are installed correctly as per approved support detail for the drains. | |||||
Barricade & Cover all installed drains after fixing to avoid any damage. | |||||
For ASEM QA/QC: | Date: | FOR ALJABER QA/QC: | Date: | For ADNOC Rep.: | Date: |
Name: | Sign: | Name: | Sign: | Name: | Sign: |