Submission of the proposal to close the distribution pump opening in PT slab

Shop Drawing

Submission of the proposal to close the distribution pump opening in PT slab

Date: xxx Ref no: xxx To The Manager, DM Qualification Section (License) Dubai Municipality, Dubai UAE Sub                : Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor Dear Sir, With reference to the above, we are hereby submitting the proposal and approval by […]

Submission of the proposal to close the distribution pump opening in PT slab Read Post »

PT WORKS

Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor

Date: xxx Ref no: CC/DT/DM/12 To, Dubai Municipality Building Control section Dubai, UAE Project        : 2B + G + 14+ Lower Roof Hotels Building on Plot No. 373-1297 at Barsha, Dubai Sub                : Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor Dear

Submission of the proposal to close the distribution pump opening in PT slab from 4th floor to roof located in corridor Read Post »

Scroll to Top