Main Contractor Instruction –Rectification of Switch Location- Tower 3, Pod 21, Type A.

Our Ref: xxx Date: xxx To                           : xxx Construction Engg. Corp. (Middle East) LLC                                   P. O. Box xxx   Dubai, U.A.E. Attention            : Mr. xxx Project                 : xxx – Zabeeel Second, Dubai, UAE. Subject:               Main Contractor Instruction –Rectification of Switch Location- Tower 3, Pod 21, Type A. Dear Sir, We refer to […]

Main Contractor Instruction –Rectification of Switch Location- Tower 3, Pod 21, Type A. Read Post »