Main Contractor Instruction –Rectification of Switch Location- Tower 3, Pod 21, Type A.
Our Ref: xxx Date: xxx To : xxx Construction Engg. Corp. (Middle East) LLC P. O. Box xxx Dubai, U.A.E. Attention : Mr. xxx Project : xxx – Zabeeel Second, Dubai, UAE. Subject: Main Contractor Instruction –Rectification of Switch Location- Tower 3, Pod 21, Type A. Dear Sir, We refer to […]
Main Contractor Instruction –Rectification of Switch Location- Tower 3, Pod 21, Type A. Read Post »
