Method Statement Title: Testing of LV Cables / Wires

METHOD STATEMENT FOR WIRES AND CABLES INSTALLATION

METHOD STATEMENT FOR WIRES AND CABLES INSTALLATION

Method Statement Title: Testing of LV Cables / Wires

1.0       Scope

  1. Testing of LV Cables / Wires installed in Tower according to the requirement of the Project Specification.

2.0       Material

3.0       Testing Equipment

Note : The Calibration certificates of testing instruments shall be verified to have current certificate, prior to usage.

4.0       Testing and Commissioning Method

4.1       Physical Checks

4.2       Insulation Resistance Test

5.0       Records

5.1       Inspection request duly signed-off by NMX and Consultant.