Method Statement Title: Installation of Capacitor Banks

METHOD STATEMENT FOR POWER FACTOR CORRECTION CAPACITORS INSTALLATION

METHOD STATEMENT FOR POWER FACTOR CORRECTION CAPACITORS INSTALLATION

1.0       Scope

  1. This method statement details the method of Installation of Capacitor Banks according to the Specification Section 16410.

2.0       Material

3.0       Applicable Location

4.0       Method

4.1       Storage  

4.2       Installation

4.2.1    Ensure approved documents like shop drawing and electrical room

            layouts are available with the installation team.

            channel.

                                    pieces fallen during cable cutting and terminating process.

                                    specification requirement.

5.0       Safety

5.1       Safety Officer shall ensure that the technicians have undergone safety

            induction program, and all safety procedures are followed.

5.3       Workmen shall be given proper training to use PPE and shall be 

            monitored to avoid any violation of the same.

5.4      Electric tools will be checked and certified by Safety Officer and

            earthing of the same shall be ensured.

           plan and procedures.

6.0       Records

6.1       QC Inspection Check List.

6.2       Inspection request duly signed-off by NMX and Consultant.

7.0       Attachment