Dear Mr. xxx,

We refer to our letter Ref: xxx dated 20th October xxxx and the Minutes of Meeting dated 22nd October xxxx.  Please see below an update on the progress.

  1. Change in Door Structural Opening
  2. Revised Shop Drawings
    1. Our team started modifying all drawings for C1 and it will be resubmitted by the end of next week.
    1. Based on your request, we will not wait for an approval on the revised drawings, and we shall resume production as fast as possible, however, please note that reissuing the fabrication drawings, modifying the molds, reprogramming the wall machine, etc. will take about five days.

Yours faithfully,